Long Hung Pagoda Rooftop Solar Power.

In this project, MICT Energy played the role of general contractor (EPC), performing all the work from survey, layout design, technology equipment supply, to construction and installation. This project is known as a charity project for the largest temple in Dong Anh district, also known as the Center for Translation, Interpreting and Publishing of Buddhist Books of the Vietnam Buddhist Sangha. This 75kW grid-tied system after completion has helped save a lot of electricity costs, and the configuration of 156 solar panels has also increased the aesthetics of the whole temple.


Services

EPC

Time

08/2022 - 10/2022

Location

Phuong Trach, Dong Anh district, Hanoi

Scale

75kW